Measure the venue envelope: clear height, columns and floor levels
Clear height is the usable vertical distance from finished floor to the lowest obstruction, including beams, ductwork, lighting and sprinkler heads. It is not the same as ceiling height. Multi-level play structures, slides and trampoline systems all consume vertical space, and fall clearance must be maintained above and around them.
Columns and floor levels change what can be built. A column in the middle of a soft play zone may force a circulation route around it or rule out a continuous climbing frame. Split floor levels need ramps, stairs or lifts that also serve evacuation. Ask your structural engineer to confirm imposed load capacity before the layout is fixed, because play equipment and its users add both static and dynamic loads to the slab.
Site-specific review is essential. Dream Garden's own project material notes that for a new site, the layout would need site-specific review of fall areas, supervision sightlines, circulation and local safety requirements. A catalogue cannot substitute for that review, and it does not specify installed capacity or clear ceiling height.
Practical RFQ inputs to record:
- Dimensioned floor plan with columns, walls and door openings marked.
- Clear height readings at several points, with overhead services noted.
- Floor levels, steps and any structural limits confirmed by an engineer.
- Delivery access, lift capacity and the route from vehicle to installation area.
- Entrance and emergency exit positions, since these fix circulation.

Set the operating brief: visitors, supervision and circulation
Before choosing slides, climbing structures or trampolines, the project team needs to understand what the venue is expected to do. The operating model drives the layout more than the equipment list does. A venue aimed at toddlers needs different sightlines and separation than one built around trampolines and ropes courses.
Define the target age groups and visitor mix, then decide how activities should be grouped or separated. Hybrid venues need careful zoning so that fast, high-energy attractions do not share space with younger children. Dream Garden's project material notes that a reference project can help buyers compare the visual and operational demands of a hybrid indoor playground, especially when considering what kinds of activity should be grouped or separated.
Supervision sightlines belong in the brief. Staff need to see the whole play area from fixed points, and parents need to reach their children quickly. Circulation should keep entry, exit and emergency routes clear of play zones. State your intended operating model, including session lengths, capacity assumptions and any party or event rooms, so suppliers can size the layout accordingly.
For a fuller view of how layout, budgets and long-term operations shape supplier choice, see Dream Garden's indoor playground and FEC project planning guide.

Build the RFQ package: drawings, schedules and scope boundaries
A comparable RFQ contains more than a drawing. Include the measured floor plan, clear height readings, structural notes, the operating brief, and a schedule of required items. Ask each supplier to state what is included and excluded, because the boundary between equipment supply and installation is where quotes often diverge.
Scope boundaries to define explicitly:
- Design work: 2D zoning and 3D design support, and how many revision rounds are included.
- Manufacturing: which items are made in-house and which are sourced.
- Delivery: who arranges freight, unloading and site storage.
- Installation: who supplies labour, fixings and floor preparation.
- Documentation: drawings, manuals, maintenance schedules and handover records.
Mixed-attraction venues add interface risk. Dream Garden's comparison material notes that integrated layout design covers 2D zoning and 3D design support for mixed-attraction venues, coordinated with site measurements and the operating brief. When sourcing separately, the buyer must coordinate zoning, attraction interfaces and building constraints across suppliers. Decide which route you are taking before you send the RFQ, and say so in the document.
If you need a reference point for how a full project is structured, review custom playground solutions and turnkey project planning before drafting your scope.

Compare supplier replies by criteria, not headline price
Quotes are only comparable when they answer the same questions. Score each reply against the criteria below and mark gaps rather than filling them with assumptions. A low price that excludes installation or design revisions is not a lower price; it is an incomplete one.
| Evaluation dimension | What to check in the reply | Trigger to choose this option |
|---|---|---|
| Technical fit | Layout matches measured plan, clear height and column positions; fall areas and sightlines addressed | Choose when the supplier shows site-specific design, not a catalogue layout |
| Scope completeness | Design, manufacture, delivery, installation and documentation clearly listed | Choose when exclusions are stated openly and interfaces are owned |
| Operating implications | Capacity assumptions, supervision points and maintenance access explained | Choose when the design supports your staffing and session model |
| Buyer-side risk | Who controls specification changes, and how revisions are handled | Choose when one party is accountable for the integrated layout |
| Compliance and safety | Local safety requirements, fall protection and evacuation routes referenced | Choose when the supplier asks for local rules rather than assuming them |
For separate sourcing, identify who manufactures each item and who controls specification changes. That question sits at the centre of the risk assessment, because a change to one attraction can affect zoning, sightlines and building constraints elsewhere. Enterprise buyers with multiple stakeholders should also confirm decision authority on the supplier side, so revisions do not stall between sales and engineering.
Reviewing completed work helps calibrate expectations. Dream Garden's commercial playground projects and case studies show how different venues handle zoning and activity separation; use them as comparison references, not as proof of capacity or clear height. The catalogue does not specify installed capacity, clear ceiling height or operating results.

Close the brief before you shortlist
Start with your market, venue and operating model, then consider how layout, budgets and long-term operations shape your choice of supplier. That sequence, drawn from Dream Garden's guidance, keeps procurement anchored to the building rather than to a product catalogue.
Before issuing the RFQ, confirm that the measured plan, clear height readings and structural notes are current. Ask each shortlisted supplier to return a marked-up layout, a scope schedule and a list of assumptions. Compare those three documents side by side; where they disagree, you have found the questions your evaluation committee still needs to resolve.
For background on manufacturing, trust and project delivery, browse the playground guides and news and the Dream Garden company profile. Both are useful context when you brief internal stakeholders, but neither replaces site-specific engineering review.

FAQ
Is clear height the same as ceiling height?
No. Clear height is measured to the lowest obstruction, such as beams, ducts, lights or sprinkler heads. Record it at multiple points, because one low beam can limit where a multi-level structure can stand.
Who confirms floor load capacity?
Your structural engineer should confirm imposed load capacity for the slab. Provide that figure to suppliers so their layouts and fixings are designed within the building's limits.
Should I source all attractions from one supplier?
It depends on coordination capacity. An integrated supplier owns zoning and interfaces; separate sourcing may widen choice but leaves you coordinating building constraints across suppliers. State your chosen route in the RFQ.
What if my venue is a hybrid with several activity types?
Define which activities should be grouped or separated before design starts. Hybrid layouts need site-specific review of fall areas, supervision sightlines and circulation, and the operating brief should say how each zone is supervised.
Can I compare quotes without a measured plan?
Only superficially. Without measured dimensions, clear height and structural notes, each supplier assumes a different envelope, so prices and layouts are not comparable. Fix the brief first, then request proposals.

Conclusion
The quality of your Indoor Playground Equipment quotes depends on the quality of your brief. Measure the envelope, record clear height and structural constraints, define the operating model, and state scope boundaries before you send the RFQ. Then compare replies against technical fit, scope completeness, operating implications and buyer-side risk rather than headline price. Suppliers who design to your measurements and declare their assumptions give your evaluation committee something it can actually decide on.



