Playground Installation Services

Step 05 · Installation. Choose how your playground is installed: our own installation crew on site, a Dream Garden supervisor guiding your local installers, or remote guidance with labelled parts and numbered 3D manuals. The option is fixed in the contract before your equipment leaves the factory.

All services overview
Full indoor trial assembly of a playground structure with steel frames and slides
Installation & HandoverInstallation crew, on-site supervision or remote guidance, backed by zone-coded 3D manuals.
Steel frame production across the floor of the playground manufacturing workshop

Installation / Three options

Our Crew, On-Site Supervision or Remote Guidance

Every option uses the same zone-coded package labels and numbered 3D assembly manuals. Floor leveling, civil works, unloading equipment, electrical/HVAC, fire sprinklers, and local operating approvals remain with your local venue team.

Option 01 · Full installation

Dream Garden installation crew

Our installation team travels to your site, assembles the supplied equipment to the approved drawings and completes the handover checks with your operator. Airfare, visas, lodging and daily rates are set out in the contract.

Option 02 · Supervision

On-site supervisor, local installers

A Dream Garden supervisor works on site with installers you hire locally, setting out, sequencing the assembly and checking the work against the drawings. Supervisor travel and daily rates are agreed in the contract.

Option 03 · Remote guidance

Remote installation guidance

Your contractor or local team installs from labelled parts and numbered 3D manuals, with video checkpoints and drawing walk-throughs from our engineers at key stages.

Which Installation Option Fits

Use this to choose a crew model before pricing. Durations are typical ranges for planning, not a promised schedule for every venue.

Decision pointOption A · Dream Garden crewOption B · Supervisor + local teamOption C · Remote guidance
Best fitComposite FECs over 500 m², multi-level aerial nets and trampoline parks.Indoor soft-play venues of 200–800 m² where you already have a local installation crew.Single-level or modular venues under 200 m², family restaurants and fast-track openings.
Typical durationFastest. A crew that already knows the assembly sequence commonly shortens on-site time by 30%–50%.Medium. Duration depends on coordinating the pace of the local crew.Set by you. Your team follows the numbered 3D manuals step by step.
Cost structureVisas, airfare, insurance, accommodation, meals and daily labor in one managed package.Travel for 1–2 engineers, plus wages for the local crew you hire.Lowest. No travel cost. Support is the equipment, drawings and manuals.
Safety sign-offEngineers complete the handover and issue the installation quality record.The supervisor checks each item and issues a workmanship confirmation.Key stages are closed with HD video and checkpoint photos.

Installation Costs

All rates are in USD. Billing examples use the Portugal project shown in the gallery below; they are planning illustrations, not fixed quotations for every venue.

Installation arrangementInstallation fee (USD)Transit allowance (USD)Billing examples (Portugal project reference)Customer responsibilities
Daily-rate installation
Billed by actual on-site and transit days
$150–$180 per engineer / day
Rate by engineer level—see below
$50 per engineer / day
Round-trip transit between Wenzhou and the project city

Example A (smaller): 2 engineers, 10 on-site days, 4 transit days.
On-site: 2 engineers × 10 days × rate = $3,000–$3,600
Transit: 2 engineers × 4 days × $50 = $400
Total: $3,400–$4,000

Example B (larger): 4 engineers, 15 on-site days, 4 transit days.
On-site: 4 engineers × 15 days × rate = $9,000–$10,800
Transit: 4 engineers × 4 days × $50 = $800
Total: $9,800–$11,600

Visas, airfare, insurance, accommodation and meals booked directly by the customer or reimbursed to the crew.
Contract installation
Fixed package per approved project design
Quoted as one package price for the project designIncluded in the project package quotationFor the same workload as Example A (2 engineers / 10 on-site days / 4 transit days), the supplier may quote one fixed total after assessment (for example $4,500), with no later re-billing by actual days.Visas, airfare, insurance, accommodation and meals as stated in the contract.
Customer self-installationInstallation arranged by the customerNot applicableNo crew travels from Wenzhou; the customer’s local team in Portugal (or elsewhere) completes the installation.The customer or their local team carries out on-site assembly.

Engineer rate levels

  • $180 per engineer / day — Senior Engineer / Lead Engineer: extensive field experience, able to lead independently and coordinate complex technical work on site.
  • $150 per engineer / day — Standard Engineer / Field Engineer: proficient in standard installation procedures and routine assembly tasks.

Western clients may also see these roles labeled Senior Technician and Standard Technician in contracts or quotes.

Installation in practice / Portugal

300 m² Jungle Playground: 10 Days on Site

See how 2 Dream Garden installation engineers worked with 2 local helpers, with 4 round-trip transit days and 10 days of on-site installation. Explore the design, completed venue and the $3,400–$4,000 engineer labor and transit allowance range in Option 1 Example A, excluding visas, flights, insurance, accommodation, meals and local helper wages.

View the Portugal installation case and cost breakdown

After the cargo arrives

Installation Sequence

Five stages from site readiness to sign-off. The same order applies whether our crew installs, a supervisor leads your team, or you follow remote checkpoints.

  1. Phase 1

    Pre-arrival and site readiness

    Submit the civil-works checklist. Confirm floor level within 5 mm, a clear lifting path at the main entrance, column clearance, and the water, power and drainage points reserved on the drawings.

  2. Phase 2

    Unloading and zone-coded staging

    Sort packages from the packing list and the colour or number labels straight into the matching play zones—toddler, aerial climb and slides—so parts are not moved twice on site.

  3. Phase 3

    Steel frame and floor anchors

    Assemble posts and beams, check them with a laser level, and set chemical anchors to the pull-out values on the approved drawings.

  4. Phase 4

    Components and soft padding

    Join fibreglass or stainless slides at the specified seams, tension overhead safety nets and record the pull test, then wrap flame-retardant PVC and crash pads so no screws or sharp edges stay exposed.

  5. Phase 5

    Safety audit, dynamic test and sign-off

    Run static load and dynamic slide checks, probe openings for head and finger entrapment, and sign the bilingual completion record.

Before the crew starts

Site Readiness Checklist

This split is the working interface for the contract. Items in the client column stay with your venue team unless the agreement says otherwise.

ConditionClient / venue scopeDream Garden scope
Building worksLevel, hardened floor (concrete substrate), ceiling clearance, and fire-sprinkler or detector approvals with the local authority.Point-load drawing for the foundations, plus the clear-height requirement for the approved design.
Power and lightConstruction power from an industrial board (typically 380 V three-phase and 220 V), and working light of at least 200 lux across the floor.Standard pneumatic and electric installation tools, plus the test instruments used for the sign-off checks.
Unloading and accessForklift or crane for unloading, and scaffolding or a scissor lift for work at height.Direct the lift into place and control balance points while components are set.
Storage and securityA dry, lockable, weatherproof store for materials, and removal of crates and site waste.Unpack and count materials, and sort original spare parts by code.

Checks on site

Safety and Compliance Verification

Assembly gaps are checked against the standard named in your contract. Local permits and the insurer’s inspection remain with your consultants.

  • Assembly gaps

    On-site openings and gaps are checked to the standard specified for the project: EN 1176 in Europe, ASTM F1918 / F1487 in North America, or AS 4685 in Australia.

  • Probe set

    The crew uses dedicated probes for head and neck entrapment, torso entrapment and rope-loop gauges. Results are recorded before sign-off.

  • Flame-retardant wraps

    Soft goods specified for the project are supplied with the matching flame-retardant report, such as EN 13501-1 or NFPA 701, and are checked as they are fitted.

Planning illustration

Installation Timeline Estimate

Enter floor area and clear height. The result uses the same bands as the comparison above and the published crew-day examples. It is a planning range, not a quotation.

Option B · On-site supervisor

After delivery / Related support

Maintenance & Spare Parts Resources

Use the dedicated guides for routine care and project-matched replacement parts. For technical help with equipment already delivered, use the post-delivery support route.

Step 05 / Deliverables

What You Receive at This Step

  • Numbered 3D manualsExploded assembly drawings in sequence, matched to the package labels.
  • Zone-coded packagesComponents bundled and labelled by play zone for faster sorting on site.
  • Installation option in the contractCrew, supervision or remote guidance, with travel and daily rates defined upfront.
  • Handover checksAcceptance checks and open items recorded at the end of installation.

FAQs

Installation Questions

Plan installation for your venue

Send the country, floor area, clear height and whether you want our crew, a supervisor or remote guidance.

Enter at least one contact method: email address or WhatsApp / phone number.

We respect your privacy. Your information will only be used for project communication.

Does Dream Garden send its own installation team?

Yes. Our installation crew can assemble the equipment on site, or a supervisor can guide your local installers. Airfare, visas, lodging and daily rates are set out in the contract.

Can our local contractor install the playground?

Yes. Your contractor works from labelled parts and numbered 3D manuals, with remote engineer guidance by video at key stages, or with a Dream Garden supervisor on site.

What must the site have ready before installation?

A level, finished floor, power, lighting, unloading equipment, access for long components and agreed working hours. Civil works, electrical/HVAC and sprinklers remain with your local team.

Which installation option suits my project?

Complex multi-level structures and tight opening dates usually suit our crew; an experienced local contractor suits supervision; smaller modular scopes suit remote guidance.

Design & build by project type

Need one contractor for the whole venue?

This step is part of a single design-and-build contract. See how it applies to your project type.

Pre-Purchase Installation Planning

Planning installation for an upcoming playground order?

Share your country, venue size, and whether you prefer our installation crew, on-site supervision of a local contractor, or remote guidance. For equipment already delivered, use handover and lifetime support.

Discuss Installation Requirements