Custom Play Equipment
Soft play structures, safety padding, interactive ball pits, slides, and age-segregated zones—tailored to your exact pillar grid and ceiling clearances.
New Investor & Turnkey Project Guide
Dream Garden offers first-time playground investors a free zoning feasibility assessment and ballpark budget within 48 hours of receiving their floor plan, sketch or leased dimensions. Direct factory supply carries no franchise fees or revenue royalties; the equipment quotation is based on your venue dimensions, clear height, target ages and agreed equipment scope.
| 0% Royalties & Fees 100% your own brand & ticket revenue | 48h Space Feasibility Quick zoning check before you sign the lease | 100% Pre-Assembled Factory trial assembly guarantees exact fit |

01 / Start here
Check the building before you sign the lease. Each step below is a checkpoint first-time operators use to avoid unplayable ceiling heights, unclear quotes, and inspection surprises.
1 Consultation & Venue AssessmentShare your floor plan, clear heights, location, target users and budget. Review site constraints and local responsibilities before design begins. | 2 Design & Quotation ConfirmationReview the layout, 3D concept, equipment specification and itemized quotation. Confirm the scope, drawings and installation option before production. | 3 Production & Quality InspectionManufacture the approved equipment in our factory, with agreed quality checks, progress records and trial assembly before packing. |
4 Export Packing & Global ShippingProtect and label components, prepare packing lists and export documents, and coordinate transport under the agreed shipping terms. | 5 Installation & Commissioning SupportAssemble and check the supplied equipment using the agreed installation crew, on-site supervisor or remote engineering guidance. | 6 Handover & Lifetime CareRecord handover checks, provide care instructions and support opening preparations, with ongoing technical assistance and matching spare parts. |
New to FEC or mall play investments? Send a floor plan sketch — we reply with zoning notes before you sign rent.
Start with a free layout review02 / Financial Reality Check
Equipment is only 40–45% of your total initial capital. A successful opening requires planning your entire launch stack so you never face a cash-flow freeze mid-build.
01
40% – 45% Custom Play EquipmentSoft play structures, safety padding, interactive ball pits, slides, and age-segregated zones—tailored to your exact pillar grid and ceiling clearances. | 02
25% – 30% Fit-Out, HVAC & Safety ComplianceFlooring, electrical, air circulation, party rooms, entry turnstiles, and landlord-mandated fire suppression/sprinkler drop clearances. | 03
25% – 30% Logistics, Install & Cash BufferOcean freight, destination port clearance, installation crew, ticketing/POS systems, staff training, and 2–3 months of operating reserve before steady cash flow. |
03 / Quick Feasibility Check
Don't worry if you don't have an architect or CAD file yet. You only need the basics to receive our initial layout recommendation:
| Target City & Country: Needed to specify whether you require ASTM (US), EN 1176 (EU), or AS 4685 (Australia/NZ) certifications. |
| Rough Floor Dimensions: Approximate square meters or feet, along with any known building column spacing. |
| Clear Ceiling Height: The lowest clearance under steel beams, air ducts, or sprinkler heads (critical for multi-tier heights). |
| Target Age Group: Toddler exclusive (0–4 yrs), family mixed (1–12 yrs), or high-energy adventure/ninja (ages 6+). |
| Target Opening Window: Standard manufacturing + shipping + install takes roughly 14–18 weeks end-to-end. |
04 / Social proof
Compare real installations and filter our global portfolio by venue size, region, and equipment mix — then return here to scope your own layout.
Flagship FEC reference1,200 m² mall anchor with multi-tier soft play, trampoline courts, and unified theming — Chile. Happy Panda case study | Browse by venue & equipmentFilter delivered projects that match your planned footprint and attraction mix. Standalone FEC installs Trampoline parks Municipal outdoor | ![]() Turnkey delivery processSame six factory steps we use on every export project — from CAD zoning to installation handover. View turnkey workflow |
05 / Deep dives
Continue with calculators, ROI models, and compliance guides — all free, no registration wall.
| CapEx & ROI guide |
| Space & budget calculator |
| How to prepare your project brief |
| ASTM vs EN 1176 standards |
| Download brief checklist (TXT) |
06 / Choose your path
After the checklist, dive into venue-specific engineering guides.
![]() Indoor Playgrounds & FECsMulti-tier soft play, parties, and peak-weekend throughput for destination venues. Explore FEC solution | ![]() Shopping Malls & RetailColumn grids, sprinkler clearances, and fast rent-free fit-out windows. Explore mall solution | ![]() Play Cafés & RestaurantsCompact toddler zones with parent sightlines and quiet operation. Explore play café solution |
![]() Hotels & ResortsGuest-stay dwell time, durable finishes, and quiet hours compliance. Explore hospitality solution | ![]() Schools & Early LearningSensory zones, inclusive routes, and institutional safety documentation. Explore education solution | ![]() Parks & CommunitiesOutdoor municipal bids, ADA-inclusive routing, and weather-rated structures. Explore community solution |
07 / FAQs
Direct answers for buyers who have never run a playground, and who need the equipment to pass local inspection and fit the building.
I have never operated a playground before. Can I really do this?Yes. Over 60% of our international clients are first-time investors. Unlike franchises that take 5–10% of your gross sales every month, we provide direct turnkey support: custom CAD designs, full safety compliance documentation, installation dispatch, and operational equipment SOPs. You own your brand, your tickets, and 100% of your profits. |
Will equipment manufactured in China pass my local city/state inspection?Absolutely. Our structures are engineered to comply with strict international standards, including ASTM F1918 (USA), EN 1176 (Europe), and AS 4685 (Australia). We supply official model test reports from TÜV Rheinland and SGS, flame-retardant PVC/foam fire certificates (NFPA 701 / EN 13501), and stamped load calculations that local building officials demand. |
What if the play structure doesn't fit my building's pillars or ceiling beams?We eliminate installation surprises through 100% Factory Pre-Assembly. Every customized steel frame and slide track is fully built in our workshop before container packing. If a pillar or sprinkler drops lower than expected, we adjust the CAD module before cutting steel, not on your job site. |
How does installation work in my country? Do you send workers?You have two proven options: |
What is the realistic timeline from initial deposit to Grand Opening?A typical 500–1,500 m² venue takes approximately 14 to 18 weeks total: |
08 / Take the First Step
Not sure if your space has enough ceiling height or play capacity? Send us your floor plan, architectural sketch, or leased dimensions. Our design team will return a free zoning feasibility assessment and ballpark budget within 48 hours.
| Zero franchise lock-ins or mandatory royalty contracts |
| Direct factory engineering & itemized ex-factory BOQ |
| TÜV Rheinland / ASTM certified compliance support |
Want to see how other newcomers did it? Explore our global client portfolio or review our planning guides.
Submit your venue dimensions for a preliminary CAD layout & budget estimation.