
Product Test Record
Review the covered product and test scope with the issuer.
Open report Verify at SGS01 · Our quality commitment
From the first layout to project handover, quality is a series of decisions you can follow — in the design, the materials, the production checks and the documents behind your equipment.
Product-specific evidence. Project-specific requirements. Clear documentation.

02 · Quality system
A connected process from design to delivery. Each checkpoint keeps the confirmed equipment scope, drawings and inspection records aligned.
Confirm the users, layout, equipment and project requirements.
Reviewed drawingsCheck incoming materials and components against the agreed specification.
Material recordsFollow dimensions, connections and workmanship through manufacture.
Process checkpointsReview assembly, finish and the tests specified for the equipment.
Inspection evidenceMatch packing lists, installation information and handover documents.
Project handoverA checkpoint is complete when its result is recorded and any identified issue has a clear follow-up.
03 · Safety
Quality starts before a component reaches the workshop. We review how the equipment fits the intended age group, activity and venue, then carry those decisions into the production drawings.
Review the frame, fixing details and the interfaces between play modules.
Coordinate circulation, landings, enclosure and the clearances required by the selected activities.
Keep the design brief tied to the children, staff and play environment the project will serve.

04 · Materials
The materials behind a playground should be as clear as its appearance. Incoming checks connect the agreed specification to the steel, padding, fabric and purchased components used in the order.
Check the specified steel, tubing, fixings and surface finish.
Review foam, coverings, seams and padding for the confirmed application.
Match purchased parts and material documentation to the selected equipment.

05 · Manufacturing
Checks belong inside the production process. Drawings, workmanship and module fit are reviewed as the equipment moves through fabrication, upholstery and assembly.
Check dimensions, welded connections, edges and the specified finish.
Review cutting, stitching, padding coverage and component fit.
Identify non-conforming work, agree the correction and recheck it before release.

06 · Inspection
Factory inspection brings the completed configuration back to the approved scope. The inspection plan and any third-party testing are confirmed for the product and project, rather than assumed for the entire catalog.
Check component quantities, fit, movement and finishing against the order.
Review connections, accessible edges, protection and the specified clearances.
Record findings and follow up on identified issues before packing.

07 · Standards & compliance
The right evidence depends on the equipment, the destination and the agreed project requirements. A manufacturing audit, a product test and a project inspection document answer different questions.
A company audit does not replace a product test report. A report for one configuration does not automatically cover another model or destination.

Review the covered product and test scope with the issuer.
Open report Verify at SGS
Confirm the issuing body, covered models and current status.
Open document Verify Report08 · Delivery & after-sales
Quality control continues through packing, transport preparation and installation support. Clear labels and usable documents help the equipment arriving on site match the project that was approved.
Cross-check part labels, packing lists and protection before dispatch.
Coordinate drawings, assembly information and the agreed installation support.
Confirm care guidance, spare parts and the warranty terms included in the project.

Questions & answers
Start with your destination, equipment type and the requirement you need to demonstrate. We will help identify the available records and their applicable scope.
Browse All FAQsUse the issuer’s own verification entry linked on each record above — Certipedia for the audited manufacturer certificate, SGS online report viewing for SGS records. The issuer’s portal is the source of truth for status and scope.
No. Every report names the specific products and configuration it covers. We never extend a document’s scope beyond what the issuer states.
Public records can be linked or downloaded from the issuer portal. Project-specific documents are provided through the confirmed project channel — tell us your equipment model and destination so we confirm what applies.
Compliance requirements are destination- and project-specific. Share the destination and the standard you must meet; we confirm which existing records apply and what additional assessment your project needs.
Contact our team with the report reference and your project details. We can help confirm the available record and its scope with the issuer.
09 · Let's plan your project
Share your destination, equipment type and any technical requirements. Our team will help you identify the quality documents and support relevant to your configuration.
Project-specific or restricted records are shared through the confirmed project channel.