# Check Your Venue Clear Height Before Design

Safety & Technical Planning

Compare measured building space with an equipment envelope and the project-specific clearance specified by your design team.

3 min tool + practical guideReviewed 2026-10-22

[Read the guide](<https://www.toymakerinchina.com/resources/clear-height-checker.html#resource-content>) [Discuss your project](<https://www.toymakerinchina.com/contactus.html?source=Resource%3A%20clear-height-checker#inquiry>)

Planning notes

## Survey the lowest obstruction

Use a common reference level and mark changes in ceiling height across the whole proposed footprint.

- Record soffit or beam levels, ducts, cable trays, sprinklers and other overhead services.

- Measure service drops from the same soffit reference; avoid subtracting them again if your measurement already ends at the lowest obstruction.

- Record floor build-up above the surveyed floor reference.

Planning notes

## Use the complete equipment envelope

Ask the design team for the highest required point and its project-specific clearance. Do not substitute a generic number of play levels.

- Include structures, nets, supports and activity movement where relevant.

- Confirm installation access and maintenance access requirements.

- Discuss fire services, escape routes and building constraints separately.

Planning notes

## Review the remaining allowance

Available height equals surveyed soffit height minus service drop and new floor build-up. The remaining allowance subtracts equipment height and the specified clearance.

- A negative allowance means the entered concept exceeds the measured space.

- A non-negative allowance only means the entered vertical dimensions fit arithmetically.

- Send a marked plan, sections and site photos for engineering review before committing to a layout.

Put it into practice

## Your project preparation checklist

- Survey reference level is recorded.

- Lowest beams and services are marked on the plan.

- Floor build-up is included once.

- Equipment envelope and specified clearance are documented.

- Horizontal zones and building constraints will be reviewed separately.

## Questions & answers

I measured directly to the lowest duct. What service drop should I enter?

Use that measured height as the first input and enter zero for the service drop, so the obstruction is not deducted twice.

Does a positive allowance approve the equipment?

No. It only compares the entered vertical dimensions. The project team still needs to verify activity movement, access and building constraints.

Your next step

## Turn your planning notes into a project brief

Share the site, target users and open questions with our team. Keep your assumptions and supporting documents together for a more useful discussion.

[Discuss your project](<https://www.toymakerinchina.com/contactus.html?source=Resource%3A%20clear-height-checker#inquiry>)

---

Source: [Check Your Venue Clear Height Before Design](<https://www.toymakerinchina.com/resources/clear-height-checker.html>)